• Login
    View Item 
    •   VR-IKR Home
    • Public Infrastructure Project Contracts and Loan Agreements
    • Procurement Contracts
    • View Item
    •   VR-IKR Home
    • Public Infrastructure Project Contracts and Loan Agreements
    • Procurement Contracts
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Exim Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 02 from Beliatta to Wetiya - Contract Agreement 2014

    Thumbnail
    View/Open
    Extension of Southern Expressway Section 02 Project Cover Letter (404.7Kb)
    Extension of Southern Expressway Section 02 Project Signed Contract (592.5Kb)
    Extension of Southern Expressway Section 02 Project Contract Agreement (1.363Mb)
    Extension of Southern Expressway Section 02 Project Conditions of Contract (2.112Mb)
    Extension of Southern Expressway Section 02 Project Technical Specifications 01 (41.35Mb)
    Extension of Southern Expressway Section 02 Project Technical Specifications 02 (48.60Mb)
    Extension of Southern Expressway Section 02 Project Technical Specifications 03 (33.90Mb)
    Extension of Southern Expressway Section 02 Project Drawings (25.49Mb)
    Extension of Southern Expressway Section 02 Scope of Work and Bill of Quantities (5.121Mb)
    Extension of Southern Expressway Section 02 Supplementary Information (6.108Mb)
    Date
    2014-09-29
    Author
    Ministry of Highways
    Road Development Authority (RDA)
    Metadata
    Show full item record
    Abstract
    Included here are the contract documents related to the Construction of Extension of Southern Expressway from Matara to Hambantota Section 02 from Beliatta to Wetiya dated 2014.09.29 - RDA/SEEP/CONT/S2. The project was executed by Ministry of Highways and implemented by the Road Development Authority (RDA). The funder for this project was the Exim Bank of China and the contractors were China State Construction Engineering Corporation Limited and China Railway First Survey and Design Institute.
    Note
    Description
    The contract documents were obtained through a Right To Information - RTI request by Verite Research. Included here are 10 contract documents which have been uploaded as separate documents. The documents are cover letter, signed contract, contract agreement, conditions of contract, technical specifications 1, 2 and 3, drawings, scope of work, bill of quantities and supplementary information.
    URI
    http://archive.veriteresearch.org/xmlui/handle/123456789/4917
    Collections
    • Procurement Contracts [21]

    Related items

    Showing items related by title, author, creator and subject.

    • Exim Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 01 from Matara to Beliatta - Contract Agreement 2013 

      Ministry of Highways; Road Development Authority (RDA) (2013-10-31)
      Included here is the contract document related to the Construction of Extension of Southern Expressway from Matara to Hambantota Section 01 from Matara to Beliatta dated 2013.10.31 - RDA/SEEP/CONT/S1. The project was ...
    • Exim Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 03 from Wetiya to Andarawewa - Contract Agreement 2013 

      Ministry of Highways; Road Development Authority (RDA) (2013-02-07)
      Included here are contract documents related to Construction of Extension of Southern Expressway from Matara to Hambantota Section 03 from Wetiya to Andarawewa dated 2013.02.13 - RDA/RNIP/HH01. The project was executed by ...
    • EXIM Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 04 from Mattala to Hambantota via Andarawewa - Contract Agreement 2013 

      Ministry of Highways; Road Development Authority (RDA) (2013-11-19)
      Included here are contract documents related to Construction of Extension of Southern Expressway from Matara to Hambantota Section 04 from Mattala to Hambantota via Andarawewa dated 2013.11.19 - RDA/SEEP/CONT/S4. The project ...

    • Verité Research Institutional Knowledge Repository copyright © 2018-2020  Verité Research
    • DSpace software copyright © 2002-2020  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of VR-IKRCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    • Verité Research Institutional Knowledge Repository copyright © 2018-2020  Verité Research
    • DSpace software copyright © 2002-2020  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV