• Login
    View Item 
    •   VR-IKR Home
    • Public Infrastructure Project Contracts and Loan Agreements
    • Loan Agreements
    • View Item
    •   VR-IKR Home
    • Public Infrastructure Project Contracts and Loan Agreements
    • Loan Agreements
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Export-Import Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 04 from Mattala to Hambantota via Andarawewa - Loan Agreement 2014

    Thumbnail
    View/Open
    Southern Expressway Extension Section 04 Project Loan (4.928Mb)
    Date
    2014-09-16
    Author
    EXIM Bank of China (Lender)
    Ministry of Finance (Borrower)
    Metadata
    Show full item record
    Abstract
    Included here are the loan documents related to the Construction of Extension of Southern Expressway, Section 04 from Mattala to Hambantota via Andarawewa dated 2014.09.16 - China EximBank GCL No. (2014) 18 Total No. (521). The project was executed by the Ministry of Highways and implemented by Road Development Authority (RDA). The funder for this project was EXIM Bank of China and the contractor was China Harbour Engineering Company.
    Note
    Description
    The loan documents were obtained through a Right To Information - RTI request by Verite Research. Included here is the loan agreement which consists of 36 pages.
    URI
    http://archive.veriteresearch.org/xmlui/handle/123456789/4870
    Collections
    • Loan Agreements [23]

    Related items

    Showing items related by title, author, creator and subject.

    • Exim Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 02 from Beliatta to Wetiya - Contract Agreement 2014 

      Ministry of Highways; Road Development Authority (RDA) (2014-09-29)
      Included here are the contract documents related to the Construction of Extension of Southern Expressway from Matara to Hambantota Section 02 from Beliatta to Wetiya dated 2014.09.29 - RDA/SEEP/CONT/S2. The project was ...
    • Exim Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 01 from Matara to Beliatta - Contract Agreement 2013 

      Ministry of Highways; Road Development Authority (RDA) (2013-10-31)
      Included here is the contract document related to the Construction of Extension of Southern Expressway from Matara to Hambantota Section 01 from Matara to Beliatta dated 2013.10.31 - RDA/SEEP/CONT/S1. The project was ...
    • Exim Bank of China : Construction of Extension of Southern Expressway from Matara to Hambantota Section 03 from Wetiya to Andarawewa - Contract Agreement 2013 

      Ministry of Highways; Road Development Authority (RDA) (2013-02-07)
      Included here are contract documents related to Construction of Extension of Southern Expressway from Matara to Hambantota Section 03 from Wetiya to Andarawewa dated 2013.02.13 - RDA/RNIP/HH01. The project was executed by ...

    • Verité Research Institutional Knowledge Repository copyright © 2018-2020  Verité Research
    • DSpace software copyright © 2002-2020  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of VR-IKRCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    • Verité Research Institutional Knowledge Repository copyright © 2018-2020  Verité Research
    • DSpace software copyright © 2002-2020  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV